Week 7 - 2nd FYP1 Briefing (20/3/2018)

Title: Workshop on Introduction (Chapter1) and Literature Review (Chapter2) Writing

Activities: On 20th March 2019, the 2nd FYP briefing was conducted at TTL2 from 3pm-4pm.
                  The talk workshop was conducted by Dr Imran Mohamad Sofi

The main point that was highlighted on this briefing was :

  • To write a good FYP1 report according to structure given
  • To write a compact Introduction of the FYP1 report
  • To organize and write a fine Literature Review
Lastly Dr.Imran reminded all the student to start the report early. Below are the note on that date;





Saturday, March 16, 2019

Week 6 - Abstract Draft and Finalize

Activity: Supervisor has reply the email and inform which part of the abstract to be improve and                         updated

Below is the comment on the abstract,

As commented on the above picture, I have write more clear and concise abstract base on supervisor comment and below is the abstract updated:


Sunday, March 10, 2019

Week 5 - FYP Title Registration Week

By this week, project abstract is draft roughly. It is to get a sneak peak of the project overview. Below is the rough draft of the abstract to be sent to supervisor:

During the final year studies, each student of UniKL British Malaysian Institute is assigned to complete the Final Year Project 1 or also known as FYP 1 with code WPB49804. The main objective of this project is to teach students how to think in advance way, to gain first class experience of designing, making wiring connection and troubleshooting where all the knowledge and skills learned from previous semester is to be apply. To fulfil the requirement I have decided to implement a new technology on recycling bin which is call Sorting and Monitoring of Recycle item with IOT. The main objective of this project is to reduce the problem of mix trash in a recycling bin which result to a higher cost and time wasting.
As a start, this project will sort two item which is empty water can and also plastic tupperware. Besides that, the trash level in the bin can be monitor by using IOT which made the cleaning or trash collection more efficient.

At the same time, supervisor also register my project officially as no further change of the title is discussed. The due date for the fyp title registration is on 8th March 2019.

Sunday, March 3, 2019

Week 4 - Title discussion and selection with Supervisor


Title : Supervisor 2nd Meeting

Objective :
  •          To discuss and declare a suitable FYP title.
  •          To discuss a suitable logbook/blog writing
  •          To discuss the next step of FYP1,
Activity :

This is the 2nd meet with the supervisor. As she required from the previous meet, 
a few project title is list out and presented to her. I came out with a few ideas and the one that suit Madam requirement is the Sorting and Monitoring of Recycle item with IOT.
At the same time we also discussed about logbook or blog writing and agreed to produce a blog for the purposes of project monitoring and drafting. Lastly Mdm. request for a project Abstract to be draft.

Discussion Photos :